Bickleigh Vale
  • Home
    • Quick Find Index
    • Edna's Vision
  • Properties
    • Map & Introduction
    • Abbotsley
    • Badgers Wood
    • The Barn
    • The Sheilan
    • Downderry
    • Glencairn
    • Hurst
    • Lynton Lee
    • Mistover
    • Sonningfield
    • Sonning
    • The Spinney
    • Wimborne
    • Windsong
    • Winty
    • Whistlewood
  • Blog
  • Contact

Bickleigh Vale Roadside Vegetation Maintenance Records​

December topping and grading

2/12/2016

0 Comments

 
Following previous discussions with the Shire after the last road maintenance work and our agreed plan for this time, more extensive work was carried out this time.

Ian Pearson from the Shire, their Contractor and his operator had all been out to site to discuss the work to be done prior to commencement of the work. The plan was to put the remaining Lilydale toppings in the turn area at the end of Bickleigh Vale Road, put some of the new Coldstream toppings product in Edna Walling Lane and leave some for us to fill potholes.
Because they were going to apply dust suppressant to Bickleigh Vale Rd (an annual event), the Contractor didn't want to put too much of the new rock on Bickleigh Vale this time in case it affects the dust suppressant.
Outcome:
  • The contractor advised us that, all the topping used this time was Lilydale Toppings and it is now fully depleted
  • There was not enough to build up the turning circle sufficiently to create a profile with a gutter on the south-eastern side of the turning circle outside Littlewood  but the depth of material on the turning circle is certainly an improvement
  • The contactor left us a metre of topping for later pot-hole filling as requested but, since there was not enough material at the part of the turning circle by the entrance to Windsong we spread the excess topping there and will wait until next time to have our ‘pot-hole top-up pile.’
Picture
Edna Walling Lane
Picture
Bickleigh Vale Rd / Edna Walling Ln
(click to enlarge)
Picture
Bickleigh Vale Rd turning circle
Ian Pearson has advised he'll meet the contractor again on site just before the next maintenance run to ensure the new Coldstream toppings are built up sufficiently in the turning circle to allow the profiling of a gutter on both sides as originally planned.
0 Comments



Leave a Reply.

    Back to Program page

    Author

    Friends of Edna Walling at Bickleigh Vale Village

    Archives

    February 2021
    April 2020
    February 2020
    September 2019
    August 2019
    May 2019
    March 2019
    February 2019
    November 2018
    August 2018
    July 2018
    May 2018
    March 2018
    February 2018
    November 2017
    September 2017
    August 2017
    June 2017
    May 2017
    February 2017
    December 2016
    November 2016
    August 2016
    July 2016
    June 2016
    February 2016
    November 2015
    September 2014
    May 2014
    July 2012

    Categories

    All

    RSS Feed

Friends of Edna Walling at Bickleigh Vale Village. All rights reserved
  • Home
    • Quick Find Index
    • Edna's Vision
  • Properties
    • Map & Introduction
    • Abbotsley
    • Badgers Wood
    • The Barn
    • The Sheilan
    • Downderry
    • Glencairn
    • Hurst
    • Lynton Lee
    • Mistover
    • Sonningfield
    • Sonning
    • The Spinney
    • Wimborne
    • Windsong
    • Winty
    • Whistlewood
  • Blog
  • Contact